Construction Expertise
Horizontal Directional Drilling - HDD
Our directional drilling service is a new way to complete HDD projects on time. Our HDD service is founded on collaboration, reliability, quality, and risk reduction with a focus on the mid to large engineered trenchless crossings. We apply the latest drilling and evaluation technologies and sound engineered processes to remove traditional barriers resulting in more options to optimize design, reduce risk and deliver projects on schedule.
Our approach is proactive and transparent from the onset. Our dedicated team is experienced in multiple scenarios and industries while operating with integrity and consideration, making us ideal for high-profile settings or low-key situations with concerned landowners. We deliver solutions by listening and planning with our customers.
Our Services
HDD pad design and extended reach HDD crossings
Wireless guidance systems with real-time at bit data to your desktop
Large diameter single run pilot bores
Active ranging and Gyro navigation
Optimization of bore design
Precision radius drilling
Reamer run optimization
Risk identification and reduction.
Geotechnical evaluation
Frac-out identification
Pressure while drilling
Logging while drilling
EQUIPMENT
HDD rigs from 1.1M to 80k lbs. pull force capability with circulating system and solids control. Full upgrade to electric over mechanical available
Up to 7 7/8” & Drill Pipe
4.75”-9.5” Rotary Steerable Systems (RSS)
Gyro and Magnetic Guidance
Ranging (Active and Passive)
Mud Motors (fit for purpose)
Bits (PDC, TCI, Hybrid)
Reamers (PDC, TCI)
TECHNOLOGY
Proven wireless guidance (EM and Mud pulse)
Wireless ranging with intersect capability.
Rotary Steerable System with continuous steering and near-bit measurements.
Real-time at bit data to surface.
Annular pressure with ECD
Automated tubular handling for safety.
Remote capability (brings live data to your
SERVICE
Construction of engineered trenchless crossings
Smooth critical radius drilling
Extended reach HDD (>2km without need to intersect)
HDD project optimization and evaluation.
Root Cause analysis and documenting lessons learned
Geotechnical evaluation
Surveying (ROW, Entry/Exit)
HDD Pad design and construction